SNU NOW / Notice

SNU Notice

Notice /

SNU Notice

Repairing construction of Engineer House

The Engineer House (Building No. 310) will be under mending construction during the period stated below.

Details

- Construction Period: 1 August ~ 10 August, 2007

- Construction Details: Painting walls inside the building and repairing the Fitness Center

- Personnel in Charge: Dean of College of Engineering (tel. 02-880-7006 or 7020)

- Cooperation Details:

  · No one will be allowed to enter the building during the construction period.

  · Dust can be produced due to the construction.

  · The restaurant ‘Geumryong’ and the auditorium are unavailable during the construction.

 

Thank you for your cooperation.

- College of Engineering